DANS 10204 material certificates help you define the inspection documentation required for purchased metal. For CNC parts, you also need traceability from that material to the delivered lot. Specify the document type, exigences matérielles, and production records before ordering stock.

Separate The Document Type From The Material Specification

DANS 10204 defines inspection document types; it does not specify the alloy or every property your part needs.

BSI lists BS EN 10204:2004 as the current release. State the governing edition and requested document type in your purchase order.

Identify the material standard, grade, forme de produit, and delivery condition separately. Include required tests and any supplementary requirements.

A certificate title cannot resolve an unspecified heat-treatment condition. De même, a raw-material document does not establish the finished part’s dimensions or coating quality.

Understand The Four Document Types

The types differ in the inspection basis, reported results, and required validation.

The British Stainless Steel Association’s inspection document guidance explains the distinctions under the 2004 révision.

Taper Inspection Basis And Content Validation
2.1 Compliance statement without test results Fabricant
2.2 Compliance statement with non-specific inspection results Fabricant
3.1 Compliance statement with specific inspection results Authorized manufacturer inspection representative independent of manufacturing
3.2 Compliance statement with specific inspection results Manufacturer inspection representative independent of manufacturing, plus purchaser representative or officially designated inspector

Specific inspection relates to the supplied products or the test unit representing them. The product specification and order determine the required tests.

Do not describe 3.1 as automatically involving an outside inspection company. Independence from manufacturing does not necessarily mean independence from the manufacturer.

Pour 3.2, define the required external validation role. A laboratory report alone does not establish that all certificate requirements are satisfied.

Illustrative summary of EN 10204 document types 2.1 2.2 3.1 et 3.2.

Choose The Type Before Material Procurement

You should choose the document type according to the applicable product and order requirements, before buying stock.

A request for “MTC” or “material certificate” can be interpreted differently. Name the standard, type, and required supporting records.

Ask whether the requested material and documents are available together. Resolve inspection arrangements and any required participation before production begins.

LRQA’s Taper 3.2 certification overview emphasizes traceable material assurance. Confirm your project’s inspection arrangement rather than assuming an existing document can simply be relabeled.

If the order instead calls for OIN 10474:2013, review that standard’s steel-product scope and requirements. Do not substitute standards without approval.

Preserve Identity From Stock To Finished Parts

Your traceability plan should connect material identity with cut blanks, machining lots, and shipment records.

Ask how the supplier retains identification when the original stock marking is removed. Consider travelers, controlled containers, cutting records, and suitable temporary identification.

Separate material lots when the order requires separate traceability. Define the treatment of offcuts and any mixed-lot shipment before manufacturing starts.

A heat number identifies a material link; it is not the same as a finished machining batch. Your records should connect both.

Illustrative traceability chain from stock and blanks to machining and delivered parts using example identifiers.
Étape de production Link To Retain
Incoming stock Supplier, stock identity, document reference, and receiving record
Coupe Parent stock identity linked to blanks and retained offcuts
Usinage Blank identity linked to work order and production lot
Further processing Lot identity linked to heat treatment or finishing records
Livraison Shipment quantity and part lot linked to the document package

For supporting identification checks, voir notre PMI guide. PMI and document traceability answer related questions, but neither automatically replaces the other.

Check The Document Against The Actual Order

A useful review checks the material, reported condition, résultats, identity, and validation against the purchase requirements.

Verify the document’s issuer, référence, product description, and applicable material specification. Check whether results represent the required product and test unit.

Compare reported chemistry and required mechanical results with the ordered acceptance criteria. Review units, test conditions, and any stated deviations.

Check the connection between received stock identification and the document. If authenticity is uncertain, request confirmation through a verified issuer contact.

Keep the original document intact. Record your review and any clarification separately rather than altering the manufacturer’s results.

Keep Later Processing Evidence Separate

You should request additional evidence when later operations affect properties or requirements outside the original material document.

A mill report describes its stated product and condition. Subsequent heat treatment, soudage, or other processing can require separate qualification and records.

Dimensional inspection and coating reports serve different purposes. List them separately in the delivery package.

If identification is lost, hold the affected material for an agreed disposition. Do not reconstruct a traceability chain from appearance alone.

Compare Quotes With The Same Documentation Scope

Your quotation should include material sourcing, traçabilité, inspection participation, and the required delivery records.

Costs depend on stock availability, minimum purchase quantities, additional tests, outside inspection, and record control. Avoid comparing different documentation assumptions.

Offres TOPS Services d'usinage CNC. Send your material and documentation requirements with the drawing so the proposed sourcing route can be reviewed together.

Confirm which documents come from the material producer and which records cover the finished component. Resolve gaps before approving procurement.

Questions fréquemment posées

Your order should resolve the certificate questions that affect sourcing and final acceptance.

Does A Type 3.1 Certificate Mean Third Party Inspection

Not automatically. The manufacturer’s authorized inspection representative must be independent of manufacturing; that is different from an outside inspector.

Does Type 3.2 Mean Better Steel

Non. It changes the required validation arrangement. The material specification and acceptance results still determine compliance.

Does A Type 2.2 Report Identify Specific Delivered Test Results

Pas nécessairement. Its results are based on non-specific inspection. Select the document type required by your order.

Can PMI Replace A Required Certificate

Not automatically. PMI measures selected material characteristics. Confirm any alternative documentation or testing arrangement before accepting it.

Can I Request Type 3.2 After Machining

Ask before procurement. Later feasibility depends on available evidence, traçabilité, and the required inspection arrangement.

Does The Mill Report Cover Finished Dimensions

Non. Request the component inspection report separately and link it to the delivered part lot.

Can One Shipment Contain Several Heats

Only under the agreed order requirements. Keep the quantities and identities linked to the relevant documents.

What Should A Documentation RFQ Include

Send drawings, material standard, grade, condition, quantité, volume annuel, document type, required tests, and traceability expectations.

Request A Material Documentation Review

Contactez-nous avec ton dessin, spécification matérielle, quantité, and required document type. Agree the stock source, traçabilité, and delivery records before production approval.

Illustration du couvercle du panneau avant en acier inoxydable brossé et coupons de référence.
Post précédent

Finition en acier inoxydable brossé Un guide de spécifications de l'acheteur

Prochain article

Devis de moulage par injection: Liste de contrôle des demandes de prix et comparaison des coûts

package-rfq-moulage par injection

Laisser une réponse

Votre adresse email ne sera pas publiée. les champs requis sont indiqués *

Let's Start A New Project Today

Envoyez votre demande aujourd'hui

    Demander un devis

    ÉTAPE, STP, IGES, PDF, DWG ou DXF; jusqu'à 10 Mo.

    Vos coordonnées et fichiers sont utilisés pour examiner et répondre à votre demande. Discutez de toutes les exigences NDA avant d’envoyer des informations confidentielles.

    Commencez à taper pour voir les messages que vous recherchez.